Realization of an APS in 8 weeks including...
- Scanner surveys of existing installations + 3D modeling
- Installation of new racks
- Routing of new piping lines
- Carrying out of piping flexibility calculations, metal framework
- Realization of rack plans
- Isometric output
- Project costing at +/- 10%
Emergency replacement of the damaged column
We present our work to you. Production of manufacturing plans and calculation note for the emergency replacement of the damaged column: Calculation code: ASME VIII DIV.1 Welding coefficient: 0.85 Position: Vertical Calculation pressure: 5 Bars Calculation temperature: 100 ° C Test pressure : 7.15 Bars 2000 mm diameter column with a body thickness of 12 mm in SA516GR70. The length between LT is 26,985 mm and the weight of 42,300 Kg.
Kronembourg project
We had the pleasure of working on theKronembourg project.
University campus
Do you know the university city of Le Havre ? It was carried out in a container and we carried out the mechanical resistance study.
Catalytic reactor
We carried out a study Calculation note and manufacturing plans according to CODAP for a vertical Catalytic Reactor with a diameter of 3500, a length between LT of 12000, stainless steel 321 material, shell thickness 30mm and a weight of 60 T .
Sulfur boiler
We present to you the photo of a device for which we have carried out the studies according to CODAP (Calculation note and production plans): Sulfur boiler with a diameter of 2750, a length between LT of 5000, material P265GH, shell thickness 45mm and a weight of 50 T.
3 columns
Aentec Normandie is proud to present to you one of the 3 columns for which we have carried out the studies. Calculation note and manufacturing plans according to the American code ASME VIII Div 1 (Stamp U) and the Australian code AS1210. Length between LT 60,000 mm, diameter 4,350 mm, shell thickness 20 mm, material 304N stainless steel, weight of 170 T empty and nearly 400 T in service.
Column head modification
The column calculation note The piping calculation note Realization of the 3D CAD model on Autocad of the existing installation via the 3D laser scan Realization of the modifications of the column head Realization of the routing of the piping lines Realization of the plans of manufacture of the column head Realization of manufacturing isometrics of the piping lines Realization of the support plans of the lines
Skid
We present to you a skid for the food industry, it is a double jacket reactor with agitator. The 3D realization under Inventor includes: a chassis, a reactor, a piping installation, electricity and instrumentation. To do this, we produced the manufacturing plans and the associated calculation notes.
Fire tube boiler
Aentec Normandie carried out the study of a fire tube boiler for Morocco. The calculation code is NFE 32-100 + CODAP Here are some characteristics: Diameter 3364, Length between LT 7516, weight of 107 T and the thickness of the shell is 72 mm in P460 NH
Reactor
Production of manufacturing plans and calculation notes according to the CODAP of a reactor. Design pressure 40 bars at 450 ° C. Diameter 750, the length between LT 2700 of thickness 25 mm in 13 Cr Mo 4-5, weight of 3 T.
4 filter bodies
Find out about the production plans and calculation notes according to the CODAP of 4 filter bodies. Design pressure 43 bars at 250 ° C. Diameter 1200, the length between LT 2200 of thickness 25 mm in P295GH, weight of 20 T.
balloon
We present to you a realization of the studies of a calculation note and manufacturing plans, of a balloon of diameter 1500, thickness 30 mm in SA 516 Gr 70 The length between LT is 4500 and the weight of 7.2 T. The building code is ASME VIII Div. 1
Hydraulic guard
Carrying out of studies (calculation note and manufacturing plans) of a hydraulic guard with a diameter of 3600, 15 mm thick in SA 516 Gr 70 (HIC) The length between LT is 6900 and the weight is 32 T. The construction code is CODAP 2000.
Extraction column
Carrying out of studies (calculation note and manufacturing plans) of an extraction column with a diameter of 2100, 30 mm thick in P295 GH The length between LT is 15 200 and the weight is 28 T. The construction is CODAP
balloons
We present to you a realization of the studies of a calculation note and manufacturing plans, of 2 balloons of 950 mm in diameter with 13 mm thick body in SA 516 Gr 60. The length between LT is 2350 mm and the weight 1615 Kg. The construction code is CODAP 2010 Div.2
Boiler manifold
We present to you a realization of studies and manufacturing plans, of a boiler manifold 1500 mm in diameter with 85 mm thick carbon steel body. The length between LT is 15,500 mm and the weight of 50,600 Kg.
New compensator
Measurements of the existing beam for the realization of a manufacturing plan for the adaptation of a new compensator with a diameter of 1278 mm in carbon steel. The overall length is 5961mm and the weight is 17,750 kg.
Reactor Dome
This time, we worked on a measurement, a manufacturing plan and a calculation note for the modification of a Reactor dome of 2502 mm in diameter with a body thickness of 8 mm in 304L. The length between LT is 5250 mm and the weight is 9600 Kg.